You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: BD-24-610-6102-352
Header Information
Bid Number:
BD-24-610-6102-352
Description:
Construction of a Temporary Facility, Department of Public Works, St. Croix, USVI
Bid Opening Date:
07/11/2024 10:00:00 AM
Purchaser:
Boyd McFarlane
Organization:
GVIBUY
Department:
610 - Department of Public Works
Location:
6102 - DEPT OF PUBLIC WORKS STX
Fiscal Year:
24
Type Code:
Allow Electronic Quote:
Yes
Alternate Id:
Required Date:
Available Date :
05/15/2024 12:00:00 AM
Info Contact:
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
Pre-Bid Conference will be conducted on Wednesday, May 22, 2024 @ 11:00 am via MicroSoft Teams. See "Pre-Bid Invite" in Attachments.
Bulletin Desc:
Ship-to Address:
DPW STX
6002 ESTATE ANNA'S HOPE
Christiansted, VI 00820
US
Email: procurement@dpp.vi.gov
Phone: (340)774-0828
Bill-to Address:
DPW STX
6002 ESTATE ANNA'S HOPE
Christiansted, VI 00820
US
Email: procurement@dpp.vi.gov
Phone: (340)774-0828
Print Format:
Bid Print New
File Attachments:
IFB-BD-24-610-6102-352~2.pdf
PLANS~1.pdf
PROJECT MANUAL~7.pdf
Pre-Bid Invite~11.pdf
Amendment One 1~36.pdf
Subcontractor Participation Goal Form - No. DPP-SPG-01-2023~14.pdf
Amendment Two 2~28.pdf
Amendment Three 3~10.pdf
Amendment Four 4~12.pdf
Amendment Five 5~9.pdf
Amendment Six 6~5.pdf
PROJECT MANUAL.4.pdf
AD1.1-TRANSACTION WINDOW.pdf
ADDENDUM1 DRAWINGS.pdf
DPW TEMP FACILITY - ADD ALT DRAWINGS.pdf
GEOTECH REPORT.pdf
Transformer Spec_13 8KV New.pdf
Bid Opening Invite~17.pdf
Form Attachments:
Required Quote Attachments
RFX Type:
Invitation for Bid (IFB)
Amendments:
Amendment #
Amendment Date
Amendment Note
1
05/22/2024 08:53:27 AM
PRE-BID MEETING LINK ATTACHED Attachment File Changes: Header 1. File 'Pre-Bid Invite~11 (1).pdf': File 'Pre-Bid Invite~11 (1).pdf' added .
2
05/29/2024 08:48:23 AM
INSERT: Site Visit, Friday, May 31, 2024 @ 9:00 AM Attachment File Changes: Header 1. File 'Amendment Two 2~28.pdf': File 'Amendment Two 2~28.pdf' added .
3
06/05/2024 08:09:25 AM
INSERT: Line Item 43, UOM: EACH DELETE: Line Item 43, UOM: SQUARE FOOT INSERT: Line Item 44, UOM: SQUARE FOOT DELETE: Line Item 44, UOM: EACH Item 43 1. UOM changed from "SQFT" to "EA". Item 44 1. UOM changed from "EA" to "SQFT". Attachment File Changes: Header 1. File 'Amendment Three 3~10.pdf': File 'Amendment Three 3~10.pdf' added .
4
06/12/2024 10:00:03 AM
INSERT: New Due Date, Thursday, June 27, 2024 @10:00 AM DELETE: Old Due Date, Thursday, June 13, 2024 @10:00 AM Header 1. Bid Opening Date changed from "06/13/2024 10:00:00 AM" to "06/27/2024 10:00:00 AM". Attachment File Changes: Header 1. File 'Amendment Four 4~12.pdf': File 'Amendment Four 4~12.pdf' added .
5
06/26/2024 08:33:18 AM
INSERT: New Due Date, Thursday, July 11, 2024 @10:00 AM DELETE: Old Due Date, Thursday, June 27, 2024 @10:00 AM Header 1. Bid Opening Date changed from "06/27/2024 10:00:00 AM" to "07/11/2024 10:00:00 AM". Attachment File Changes: Header 1. File 'Amendment Five 5~9.pdf': File 'Amendment Five 5~9.pdf' added .
6
06/26/2024 02:56:23 PM
Item 6 1. Description changed from "Foundation wall, CIP, 4' wall height, direct chute, .148 CY/LF, 7.2 PLF, 12" thick" to "Foundation wall, CIP, 4' wall height, direct chute, 8" thick". Item 7 1. Description changed from "Strip footing, concrete, reinforced, load 11.1 KLF, soil bearing capacity 6 KSF, 12" deep x 24" wide" to "Strip footing, concrete, reinforced, 16" deep x 36" wide". Item 8 1. Description changed from "Spread footings, 3000 PSI concrete, load 100K, soil bearing capacity 6 KSF, 4' - 6" square x 15" deep" to "Spread footings, 5' square x 16" deep". Item 9 1. Description changed from "Slab on grade, 4" thick, non industrial, reinforced" to "Slab on grade, 6" thick, non-industrial, reinforced". Item 68 1. UOM changed from "SUM" to "EA". 2. Description changed from "MOBILIZATION (Building Cost w/o Soft Costs)" to "ADD/ALTERNATE: Furniture Package Allowance (TF-A1.13)". Item 69 1. Item 69 added. Attachment File Changes: Header 1. File 'Amendment Six 6~5.pdf': File 'Amendment Six 6~5.pdf' added . 2. File 'PROJECT MANUAL.4.pdf': File 'PROJECT MANUAL.4.pdf' added . 3. File 'Transformer Spec_13 8KV New.pdf': File 'Transformer Spec_13 8KV New.pdf' added . 4. File 'ADDENDUM1 DRAWINGS.pdf': File 'ADDENDUM1 DRAWINGS.pdf' added . 5. File 'DPW TEMP FACILITY - ADD ALT DRAWINGS.pdf': File 'DPW TEMP FACILITY - ADD ALT DRAWINGS.pdf' added . 6. File 'GEOTECH REPORT.pdf': File 'GEOTECH REPORT.pdf' added . 7. File 'AD1.1-TRANSACTION WINDOW.pdf': File 'AD1.1-TRANSACTION WINDOW.pdf' added .
7
07/11/2024 09:25:56 AM
Bid Invite Attachment File Changes: Header 1. File 'Bid Opening Invite~17.pdf': File 'Bid Opening Invite~17.pdf' added .
Item Information
1-5 of 69
1
2
3
4
5
6
7
8
9
10
Item # 1: ( 909 - 22 )
Building Demolition
NIGP Code:
909-22
Building Construction, Non-Residential, Office Bldg., etc.
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
12,240.0
SQFT - Square foot
Item Canceled
Manufacturer:
Brand:
Model:
Make:
Packaging:
Item # 2: ( 909 - 22 )
Moving of Contents from Warehouse to dump or storage (on-site/off-site)
NIGP Code:
909-22
Building Construction, Non-Residential, Office Bldg., etc.
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
SUM - Sum
Item Canceled
Manufacturer:
Brand:
Model:
Make:
Packaging:
Item # 3: ( 909 - 22 )
Moving of Contents from Existing ADMIN BLD to Warehouse
NIGP Code:
909-22
Building Construction, Non-Residential, Office Bldg., etc.
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
SUM - Sum
Item Canceled
Manufacturer:
Brand:
Model:
Make:
Packaging:
Item # 4: ( 909 - 22 )
Moving of contents from storage to warehouse
NIGP Code:
909-22
Building Construction, Non-Residential, Office Bldg., etc.
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
SUM - Sum
Item Canceled
Manufacturer:
Brand:
Model:
Make:
Packaging:
Item # 5: ( 909 - 22 )
Moving of contents from warehouse to New ADMIN BLD
NIGP Code:
909-22
Building Construction, Non-Residential, Office Bldg., etc.
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
SUM - Sum
Item Canceled
Manufacturer:
Brand:
Model:
Make:
Packaging:
1-5 of 69
1
2
3
4
5
6
7
8
9
10
None_GVI_AWS_PROD_BUYSPEED_1_bso
Quote #
Description
Date Last Modified
Status