You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: BD-24-150-1501-346
Header Information
Bid Number:
BD-24-150-1501-346
Description:
Hazmat Assessment & Abatement/Demolition for Swan Annex & Adjacent Bldgs
Bid Opening Date:
09/10/2024 10:00:00 AM
Purchaser:
Kim Spencer
Organization:
GVIBUY
Department:
150 - Bureau of Corrections
Location:
1501 - BOC ST. THOMAS
Fiscal Year:
24
Type Code:
IB - INVITATION FOR BID
Allow Electronic Quote:
Yes
Alternate Id:
Required Date:
Available Date :
08/12/2024 08:00:00 AM
Info Contact:
kim.spencer@dpp.vi.gov
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
A Mandatory Pre-Bid will be at 10:00 AM, AST on August 22, 2024, via Microsoft Teams followed by a Mandatory Site Visit at 12:00 AM, AST at the Alva Swan Annex Facility
Bulletin Desc:
1. All contractor general conditions, overhead, and profit shall be built into the above cost figures. 2. All costs must include the removal, demolition, off-site transport, off-island transport (if required), and legal disposal of all materials, whether indicated above or not. 3. Bidder is responsible for including the costs for all required permits and fees in his/her proposal cost. 4. SOW refers to the Scope of Work document referenced in the IFB.
Ship-to Address:
BOC STT
ALEXANDER A. FARRELLY JUSTICE COMPLEX
JUSTICE COMPLEX 3RD FLOOR
St. Thomas, VI 00802
US
Email: procurement@dpp.vi.gov
Phone: (340)774-0828
Bill-to Address:
BOC STT
ALEXANDER A. FARRELLY JUSTICE COMPLEX
JUSTICE COMPLEX 3RD FLOOR
St. Thomas, VI 00802
US
Email: procurement@dpp.vi.gov
Phone: (340)774-0828
Print Format:
Bid Print New
File Attachments:
Pre- Bid Link~2.pdf
USVI Swan Hazardous Material A.zip
BD-24-150-1501-346-St. T-Swan Annex Demolition~1.pdf
Fw_ BOC - Swan Annex Hazmat Assessment & Abatement_Demolition IFB Request~3.zip
Updated Construction Documents~7.pdf
BD-24-150-1501-346-St. T-HUD Rider.docx
Construction Contract~5.pdf
NEW DBE Directory 03.2024.pdf
IFB BID SHEET - PHASE B (LOTS 104-106) v7.pdf
BID SHEET - PHASE A (LOTS 107-109) v7.pdf
Form Attachments:
Required Quote Attachments
RFX Type:
Invitation for Bid (IFB)
Amendments:
Amendment #
Amendment Date
Amendment Note
1
08/08/2024 03:14:22 PM
Amendment 1- Project Reorder Attachment File Changes: Header 1. File 'BD-24-150-1501-346-St. T-Swan Annex Demolition.pdf': File 'BD-24-150-1501-346-St. T-Swan Annex Demolition.pdf' deleted . 2. File 'Fw_ BOC - Swan Annex Hazmat Assessment & Abatement_Demolition IFB Request~3.zip': File 'Fw_ BOC - Swan Annex Hazmat Assessment & Abatement_Demolition IFB Request~3.zip' added . 3. File 'Fw_ BOC - Swan Annex Hazmat Assessment & Abatement_Demolition IFB Request~2.zip': File 'Fw_ BOC - Swan Annex Hazmat Assessment & Abatement_Demolition IFB Request~2.zip' deleted . 4. File 'Updated Construction Documents~7.pdf': Order changed from "3" to "2". 5. File 'BD-24-150-1501-346-St. T-HUD Rider.docx': Order changed from "6" to "3".
2
08/12/2024 11:13:14 AM
Amendment 2- Pre-Bid Link Added Attachment File Changes: Header 1. File 'BD-24-150-1501-346-St. T-Swan Annex Demolition~1.pdf': File 'BD-24-150-1501-346-St. T-Swan Annex Demolition~1.pdf' added . 2. File 'Fw_ BOC - Swan Annex Hazmat Assessment & Abatement_Demolition IFB Request~3.zip': Order changed from "1" to "2". 3. File 'Updated Construction Documents~7.pdf': Order changed from "2" to "3". 4. File 'BD-24-150-1501-346-St. T-HUD Rider.docx': Order changed from "3" to "4". 5. File 'Construction Contract~5.pdf': Order changed from "4" to "5". 6. File 'NEW DBE Directory 03.2024.pdf': Order changed from "5" to "6". 7. File 'Pre- Bid Link~1.pdf': File 'Pre- Bid Link~1.pdf' added .
3
08/12/2024 11:20:20 AM
Amendment 3- Link Edited Attachment File Changes: Header 1. File 'Pre- Bid Link~1.pdf': File 'Pre- Bid Link~1.pdf' deleted . 2. File 'Pre- Bid Link~2.pdf': File 'Pre- Bid Link~2.pdf' added .
4
08/20/2024 09:00:25 AM
Amendment 4- Revised Project Manual Added Attachment File Changes: Header 1. File 'BID SHEET - PHASE A (LOTS 107-109) v7.pdf': File 'BID SHEET - PHASE A (LOTS 107-109) v7.pdf' added . 2. File 'USVI Swan Hazardous Material A.zip': File 'USVI Swan Hazardous Material A.zip' added . 3. File 'IFB BID SHEET - PHASE B (LOTS 104-106) v7.pdf': File 'IFB BID SHEET - PHASE B (LOTS 104-106) v7.pdf' added .
Item Information
1-5 of 67
1
2
3
4
5
6
7
8
9
10
Item # 1: ( 912 - 23 )
Phase A - Existing Swan Annex Site Lots 107, 108, 109 Mobilization (Both Phases) 10% of base bid
NIGP Code:
912-23
Construction, General: Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, etc.
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
SUM - Sum
Manufacturer:
Brand:
Model:
Make:
Packaging:
Item # 2: ( 912 - 23 )
Removal and proper disposal of eight abandoned automobiles.
NIGP Code:
912-23
Construction, General: Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, etc.
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
8.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
Item # 3: ( 912 - 23 )
Removal and proper disposal of a septic tank along the southwest perimeter, which reportedly serviced only the restrooms, kitchen, and laundry room of the vacant Swan Annex Building.
NIGP Code:
912-23
Construction, General: Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, etc.
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
Item # 4: ( 912 - 23 )
Removal and disposal of the remaining contents in a 750-gallon diesel fuel AST and associated above-ground piping and 100-gallon diesel belly tank for generator.
NIGP Code:
912-23
Construction, General: Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, etc.
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
Item # 5: ( 912 - 23 )
Removal and recycling of an approximate 150-gallon propane AST observed in an enclosure southwest of the Swan Annex Building.
NIGP Code:
912-23
Construction, General: Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, etc.
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
1-5 of 67
1
2
3
4
5
6
7
8
9
10
None_GVI_AWS_PROD_BUYSPEED_1_bso
Quote #
Description
Date Last Modified