Bid Number: BD-22-800-8001-89 Description: Charles W. Turnbull Regional Library Capital Repairs Bid Opening Date: 09/06/2022 06:00:00 AM
Purchaser: Kim Spencer Organization: GVIBUY
Department: 800 - Department of Planning and Natural Resources Location: 8001 - DEPT OF PLANNING AND RES STT
Fiscal Year: 22 Type Code: Allow Electronic Quote: Yes
Alternate Id:   Required Date: Available Date :  08/08/2022 04:00:00 AM
Info Contact: kim.spencer@dpp.vi.gov Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Open Market
Pre Bid Conference: A non-mandatory pre-bid will take place at 10:00 AM, AST on August 16, 2022. A site visit will follow at 2:00 PM, AST on August 16, 2022, with all interested persons meeting at the Charles W. Turnbull Library Entrance.
Bulletin Desc: A copy of the bid sheet has been provided as a guide for reference. All items must be entered into GVIBUY for consideration for the award.
Ship-to Address: DPNR STT
4607 Tutu Park Mall
St. Thomas, VI 00802
US
Email: procurement@dpp.vi.gov
Phone: (340)774-3320
Bill-to Address: DPP STT
8201 SUB BASE SUITE 4
St. Thomas, VI 00802
US
Email: procurement@dpp.vi.gov
Phone: (340)774-0828
Print Format: Bid Print New
File Attachments: BD-22-800-8001-89 Charles W. Turnbull Library Regional Capital Repairs.pdf
Construction Forms and General Provisions_1~1.pdf
Updated HUD Rider 4.21.2021~3.pdf
CWT LIBRARY MICROBIAL INVESTIGATION.pdf
DWGS-CWTRLIBRARY REV BLD SECTIONS JDG.pdf
CWTRLIBRARY AC DRAWINGS JDG.pdf
Microsoft Teams Link~2.pdf
Turnbull Drawings.pdf
Microsoft Teams Link~6.pdf
Form Attachments:
Required Quote Attachments
RFX Type: Invitation for Bid (IFB)
Amendments:
Amendment # Amendment Date Amendment Note
1 08/09/2022 07:05:01 AM Amendment 1- Hud Rider Attachment File Changes: Header 1. File 'Updated HUD Rider 4.21.2021~3.pdf': File 'Updated HUD Rider 4.21.2021~3.pdf' added .
2 08/10/2022 10:01:55 AM Amendment 1- Drawings and Microbial Investigation Attachment File Changes: Header 1. File 'CWT LIBRARY MICROBIAL INVESTIGATION.pdf': File 'CWT LIBRARY MICROBIAL INVESTIGATION.pdf' added . 2. File 'DWGS-CWTRLIBRARY REV BLD SECTIONS JDG.pdf': File 'DWGS-CWTRLIBRARY REV BLD SECTIONS JDG.pdf' added .
3 08/10/2022 10:21:11 AM Amendment 3- AC Drawings Attached Attachment File Changes: Header 1. File 'CWTRLIBRARY AC DRAWINGS JDG.pdf': File 'CWTRLIBRARY AC DRAWINGS JDG.pdf' added .
4 08/12/2022 07:13:25 AM Amendment 4- Pre-Bid Link Attachment File Changes: Header 1. File 'Microsoft Teams Link~2.pdf': File 'Microsoft Teams Link~2.pdf' added .
5 08/16/2022 12:20:39 PM Amendment 5- Charles W. Turnbull Library Drawings Attachment File Changes: Header 1. File 'Turnbull Drawings.pdf': File 'Turnbull Drawings.pdf' added .
6 08/30/2022 11:36:33 AM Amendment 5- Designation of Add Alternates Item 32 1. Description changed from "Remove Portion of the Existing Sidewalk" to "Alternate No 1 Remove Portion of the Existing Sidewalk". Item 33 1. Description changed from "Excavation - New Footings" to "Alternate No 1 Excavation - New Footings". Item 34 1. Description changed from "Reinforce Concrete Pad Footings" to "Alternate No 1 Reinforce Concrete Pad Footings". Item 35 1. Description changed from "Reinforce Concrete Columns" to "Alternate No 1 Reinforce Concrete Columns". Item 36 1. Description changed from "Reinforce Concrete Roof Slab" to "Alternate No. 1 Reinforce Concrete Roof Slab". Item 37 1. Description changed from "Reinforce Concrete Roof Beam" to "Alternate No 1 Reinforce Concrete Roof Beams". Item 38 1. Description changed from "4X5 Steel Angel with 5/8 anchor bolts at 2'-0 o/c" to "Alternate No 1 4X5 Steel Angel with 5/8 anchor bolts at 2'-0 o/c". Item 39 1. Description changed from "Liquid membrane waterproofing (Fluid Applied Membrane system)" to "Alternate No 1 Liquid membrane waterproofing (Fluid Applied Membrane system)". Item 40 1. Description changed from "Exterior Composite Metal Cladding System" to "Alternate No 1 Exterior Composite Metal Cladding System". Item 41 1. Description changed from "Exterior Silicate Paint" to "Alternate No 2 Exterior Silicate Paint". Item 42 1. Description changed from "Backfilling & Compaction" to "Alternate No 1 Backfilling & Compaction".
7 09/06/2022 05:13:23 AM Amendment 7- Open Bid Link Attachment File Changes: Header 1. File 'Microsoft Teams Link~6.pdf': File 'Microsoft Teams Link~6.pdf' added .
Item Information
1-5 of 42
1 2  3  4  5  6  7  8  9 
Item # 1:   ( 909  -  61 )   Mobilization
NIGP Code: 909-61
   Maintenance and Repair, Non-Residential Building
Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost
1.0   EA - Each        
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 2:   ( 150  -  33 )   Remove Existing Gypsum Wallboard Sheathing
NIGP Code: 150-33
   Grout, Drywall
Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost
10,362.0   SQFT - Square foot        
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 3:   ( 010  -  05 )   Remove Existing Acoustic Panel Ceiling System
NIGP Code: 010-05
   Acoustical Tile, All Types (Including Recycled Types)
Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost
12,311.0   SQFT - Square foot        
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 4:   ( 770  -  41 )   Remove Existing Roofing System & Flashing
NIGP Code: 770-41
   Flashing, Eave Strips, Gravel Guards, Ridge Rolls, Valleys, etc. (Metal)
Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost
20,138.0   SQFT - Square foot        
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 5:   ( 770  -  45 )   Remove Existing Single Ply Roofing System
NIGP Code: 770-45
   Insulation, Roof, All Kinds
Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost
1,798.0   SQFT - Square foot        
Manufacturer: Brand: Model:
Make: Packaging:
 
1-5 of 42
1 2  3  4  5  6  7  8  9 
None_GVI_AWS_PROD_BUYSPEED_1_bso