Department of Property and Procurement - Bid Tabulation for Bid #BD-23-600-6001-160
Bid Tabulation for Bid #BD-23-600-6001-160
Quotes
Items
Header Questions
Subcontractors
Score
Summary
Back to Bid
# of Quotes per page:
5
10
15
20
25
50
100
Sort by:
Tab Sequence
Vendor Name
Quote Total
Descending
Ascending
Show Vendor Categories
Total Item Count:
15
Total Awardable Quote Count:
1
Bid Status:
2BPO - Bid to PO (When a Bid is turned into a PO)
Cancel
Item info/Quote info
(
V00000536
)WILSON CONSTRUCTION, INC
<Quote: Q-0000000469>
Authorized , YES Vendor has a Business License , YES Vendor has a Certificate of Good Standing , NO Vendor Does not have a Tradename Certificate , Not Preferred Status
Mobilization
Item #:1 Print Sequence:1.0 Status:2BPO - Bid to PO
Quantity:1.0 Uom:
Unit Cost
$13,469.50
Tax Rate
0.0%
Award
Awarded: 02/07/2023
Excavation
Item #:2 Print Sequence:2.0 Status:2BPO - Bid to PO
Quantity:28.0 Uom:CUYD
Unit Cost
$130.00
Tax Rate
0.0%
Award
Awarded: 02/07/2023
Backfill/Compacted
Item #:3 Print Sequence:3.0 Status:2BPO - Bid to PO
Quantity:30.0 Uom:CUYD
Unit Cost
$70.00
Tax Rate
0.0%
Award
Awarded: 02/07/2023
Reinforced Concrete Footing A. Footing
Item #:4 Print Sequence:4.0 Status:2BPO - Bid to PO
Quantity:15.0 Uom:CUYD
Unit Cost
$445.00
Tax Rate
0.0%
Award
Awarded: 02/07/2023
Reinforced Concrete Footing: B. Columns
Item #:5 Print Sequence:5.0 Status:2BPO - Bid to PO
Quantity:4.0 Uom:CUYD
Unit Cost
$1,187.50
Tax Rate
0.0%
Award
Awarded: 02/07/2023
Reinforced Concrete Footing C. Beam
Item #:6 Print Sequence:6.0 Status:2BPO - Bid to PO
Quantity:2.0 Uom:CUYD
Unit Cost
$1,600.00
Tax Rate
0.0%
Award
Awarded: 02/07/2023
Reinforced Concrete Footing: D. Installation of Concrete Blocks
Item #:7 Print Sequence:7.0 Status:2BPO - Bid to PO
Quantity:750.0 Uom:EA
Unit Cost
$18.00
Tax Rate
0.0%
Award
Awarded: 02/07/2023
Aggregate Base
Item #:8 Print Sequence:8.0 Status:2BPO - Bid to PO
Quantity:14.0 Uom:CUYD
Unit Cost
$140.00
Tax Rate
0.0%
Award
Awarded: 02/07/2023
Concrete Slab- 18" Thickness (Including forms and rebar, generator Building)
Item #:9 Print Sequence:9.0 Status:2BPO - Bid to PO
Quantity:12.0 Uom:CUYD
Unit Cost
$633.00
Tax Rate
0.0%
Award
Awarded: 02/07/2023
Install new Metal Roll-Up Door: And Frames: (12"x0" x 11" -0" Galvanized with Chain Hoist
Item #:10 Print Sequence:10.0 Status:2BPO - Bid to PO
Quantity:1.0 Uom:EA
Unit Cost
$12,000.00
Tax Rate
0.0%
Award
Awarded: 02/07/2023
Installation of Louvers Windows (4'-0" x 4'-0) As per plan specs
Item #:11 Print Sequence:11.0 Status:2BPO - Bid to PO
Quantity:3.0 Uom:EA
Unit Cost
$1,500.00
Tax Rate
0.0%
Award
Awarded: 02/07/2023
Install Exterior/Interior Fluorescent Lighting as per plan specs
Item #:12 Print Sequence:12.0 Status:2BPO - Bid to PO
Quantity:1.0 Uom:SUM
Unit Cost
$11,150.00
Tax Rate
0.0%
Award
Awarded: 02/07/2023
Installation of 150K W-Extended Duty 3 Phase Generator, Including A 500- Gallon Fuel Tank and a transfer switch
Item #:13 Print Sequence:13.0 Status:2BPO - Bid to PO
Quantity:1.0 Uom:SUM
Unit Cost
$51,234.00
Tax Rate
0.0%
Award
Awarded: 02/07/2023
Paint Interior/Exterior walls using two coats of primer and two coats of durable latex paint (Approval by the Owner)
Item #:14 Print Sequence:14.0 Status:2BPO - Bid to PO
Quantity:1360.0 Uom:SQFT
Unit Cost
$4.00
Tax Rate
0.0%
Award
Awarded: 02/07/2023
Structural Concrete Slab Roof
Item #:15 Print Sequence:15.0 Status:2BPO - Bid to PO
Quantity:5.0 Uom:CUYD
Unit Cost
$1,390.00
Tax Rate
0.0%
Award
Awarded: 02/07/2023
Totals: $Vendor Gross Total:
$ Vendor Net Total:
$ Evaluation Total:
$ Awarded:
$148,164.50
$148,164.50
$148,164.50
$148,164.50
Eval Codes:
Pref Codes:
Evaluation Code Descriptions:
= Lowest Item Price or Lowest Evaluation Quote Total