Department of Property and Procurement - Bid Tabulation for Bid #BD-23-400-4002-147
Bid Tabulation for Bid #BD-23-400-4002-147
Quotes
Items
Header Questions
Subcontractors
Score
Summary
Back to Bid
# of Quotes per page:
5
10
15
20
25
50
100
Sort by:
Tab Sequence
Vendor Name
Quote Total
Descending
Ascending
Show Vendor Categories
Total Item Count:
75
Total Awardable Quote Count:
1
Bid Status:
2BPO - Bid to PO (When a Bid is turned into a PO)
Item
Index:
1-25 of 75
1
2
3
Cancel
Item info/Quote info
(
V00000056
)D.V.D. CONSTRUCTION, INC
<Quote: Q-0000000497>
Authorized , YES Vendor has a Business License , YES Vendor has a Certificate of Good Standing , NO Vendor Does not have a Tradename Certificate , Not Preferred Status
Mobilization of up to 10% of the Base Bid
Item #:1 Print Sequence:1.0 Status:2BPO - Bid to PO
Quantity:1.0 Uom:EA
Unit Cost
$52,000.00
Tax Rate
0.0%
Award
Awarded: 04/03/2023
Complete Design Services to seal drawings and obtain all required permits. The purpose of the project is to update exist...Complete Design Services to seal drawings and obtain all required permits. The purpose of the project is to update exist...
Item #:2 Print Sequence:2.0 Status:2BPO - Bid to PO
Quantity:1.0 Uom:EA
Unit Cost
$30,000.00
Tax Rate
0.0%
Award
Awarded: 04/03/2023
ST. CROIX CENTRAL HIGH SCHOOL Existing Kettle to be removed and replaced with new owner provided kettle under existing ...ST. CROIX CENTRAL HIGH SCHOOL Existing Kettle to be removed and replaced with new owner provided kettle under existing ...
Item #:3 Print Sequence:3.0 Status:2BPO - Bid to PO
Quantity:1.0 Uom:EA
Unit Cost
$4,500.00
Tax Rate
0.0%
Award
Awarded: 04/03/2023
ST. CROIX CENTRAL HIGH SCHOOL Existing range to be removed and replaced with new owner provided range under existing ho...ST. CROIX CENTRAL HIGH SCHOOL Existing range to be removed and replaced with new owner provided range under existing ho...
Item #:4 Print Sequence:4.0 Status:2BPO - Bid to PO
Quantity:1.0 Uom:EA
Unit Cost
$5,900.00
Tax Rate
0.0%
Award
Awarded: 04/03/2023
ST. CROIX CENTRAL HIGH SCHOOL Existing serving counters to be removed and replaced with new owner provided serving cou...ST. CROIX CENTRAL HIGH SCHOOL Existing serving counters to be removed and replaced with new owner provided serving cou...
Item #:5 Print Sequence:5.0 Status:2BPO - Bid to PO
Quantity:1.0 Uom:EA
Unit Cost
$9,500.00
Tax Rate
0.0%
Award
Awarded: 04/03/2023
ST. CROIX CENTRAL HIGH SCHOOL Existing convection oven to be removed and replaced with new owner provided convection ov...ST. CROIX CENTRAL HIGH SCHOOL Existing convection oven to be removed and replaced with new owner provided convection ov...
Item #:6 Print Sequence:6.0 Status:2BPO - Bid to PO
Quantity:2.0 Uom:EA
Unit Cost
$7,500.00
Tax Rate
0.0%
Award
Awarded: 04/03/2023
ST. CROIX CENTRAL HIGH SCHOOL Existing milk cooler to be removed and new owner provided milk cooler to be located in Ser...ST. CROIX CENTRAL HIGH SCHOOL Existing milk cooler to be removed and new owner provided milk cooler to be located in Ser...
Item #:7 Print Sequence:7.0 Status:2BPO - Bid to PO
Quantity:1.0 Uom:EA
Unit Cost
$2,000.00
Tax Rate
0.0%
Award
Awarded: 04/03/2023
ST. CROIX CENTRAL HIGH SCHOOL Existing dishwasher to be removed, new owner provided dishwasher to be located in existing...ST. CROIX CENTRAL HIGH SCHOOL Existing dishwasher to be removed, new owner provided dishwasher to be located in existing...
Item #:8 Print Sequence:8.0 Status:2BPO - Bid to PO
Quantity:1.0 Uom:EA
Unit Cost
$6,500.00
Tax Rate
0.0%
Award
Awarded: 04/03/2023
ST. CROIX CENTRAL HIGH SCHOOL New owner provided refrigerated merchandiser to be added to Servery 702. (item no. 11 - re...ST. CROIX CENTRAL HIGH SCHOOL New owner provided refrigerated merchandiser to be added to Servery 702. (item no. 11 - re...
Item #:9 Print Sequence:9.0 Status:2BPO - Bid to PO
Quantity:1.0 Uom:EA
Unit Cost
$3,000.00
Tax Rate
0.0%
Award
Awarded: 04/03/2023
ST. CROIX CENTRAL HIGH SCHOOL Kitchen floor tiles and wall tiles shall be acid washed and re-grouted. Remove and replace...ST. CROIX CENTRAL HIGH SCHOOL Kitchen floor tiles and wall tiles shall be acid washed and re-grouted. Remove and replace...
Item #:10 Print Sequence:10.0 Status:2BPO - Bid to PO
Quantity:2013.0 Uom:SQFT
Unit Cost
$10.00
Tax Rate
0.0%
Award
Awarded: 04/03/2023
ST. CROIX CENTRAL HIGH SCHOOL Kitchen counters that are not stainless steel shall be removed and replaced with solid sur...ST. CROIX CENTRAL HIGH SCHOOL Kitchen counters that are not stainless steel shall be removed and replaced with solid sur...
Item #:11 Print Sequence:11.0 Status:2BPO - Bid to PO
Quantity:64.0 Uom:SQFT
Unit Cost
$250.00
Tax Rate
0.0%
Award
Awarded: 04/03/2023
ST. CROIX CENTRAL HIGH SCHOOL Ceiling grid and tiles shall be removed and replaced in the kitchen and Servery.
Item #:12 Print Sequence:12.0 Status:2BPO - Bid to PO
Quantity:1600.0 Uom:SQFT
Unit Cost
$35.00
Tax Rate
0.0%
Award
Awarded: 04/03/2023
ST. CROIX CENTRAL HIGH SCHOOL Painting of interior walls, doors and trims in the kitchen and Servery and painting of ext...ST. CROIX CENTRAL HIGH SCHOOL Painting of interior walls, doors and trims in the kitchen and Servery and painting of ext...
Item #:13 Print Sequence:13.0 Status:2BPO - Bid to PO
Quantity:413.0 Uom:SQFT
Unit Cost
$7.00
Tax Rate
0.0%
Award
Awarded: 04/03/2023
JOHN H. WOODSON K-8 SCHOOL Existing kettle to be removed and replaced with new owner provided kettles under existing exh...JOHN H. WOODSON K-8 SCHOOL Existing kettle to be removed and replaced with new owner provided kettles under existing exh...
Item #:14 Print Sequence:14.0 Status:2BPO - Bid to PO
Quantity:2.0 Uom:EA
Unit Cost
$4,500.00
Tax Rate
0.0%
Award
Awarded: 04/03/2023
JOHN H. WOODSON K-8 SCHOOL Existing serving counters to be removed and replaced with new owner provided serving counters...JOHN H. WOODSON K-8 SCHOOL Existing serving counters to be removed and replaced with new owner provided serving counters...
Item #:15 Print Sequence:15.0 Status:2BPO - Bid to PO
Quantity:2.0 Uom:EA
Unit Cost
$4,500.00
Tax Rate
0.0%
Award
Awarded: 04/03/2023
JOHN H. WOODSON K-8 SCHOOL Existing convection oven to be removed and replaced with new owner provided convection oven u...JOHN H. WOODSON K-8 SCHOOL Existing convection oven to be removed and replaced with new owner provided convection oven u...
Item #:16 Print Sequence:16.0 Status:2BPO - Bid to PO
Quantity:1.0 Uom:EA
Unit Cost
$7,500.00
Tax Rate
0.0%
Award
Awarded: 04/03/2023
JOHN H. WOODSON K-8 SCHOOL Existing tilt skillet to be removed and replaced with new owner provided tilt skillet under ...JOHN H. WOODSON K-8 SCHOOL Existing tilt skillet to be removed and replaced with new owner provided tilt skillet under ...
Item #:17 Print Sequence:17.0 Status:2BPO - Bid to PO
Quantity:1.0 Uom:EA
Unit Cost
$4,500.00
Tax Rate
0.0%
Award
Awarded: 04/03/2023
JOHN H. WOODSON K-8 SCHOOL New owner provided ice machine to be added in kitchen d104. (item no. 6 - ice machine)
Item #:18 Print Sequence:18.0 Status:2BPO - Bid to PO
Quantity:1.0 Uom:EA
Unit Cost
$4,500.00
Tax Rate
0.0%
Award
Awarded: 04/03/2023
JOHN H. WOODSON K-8 SCHOOL New owner provided water filter to be added for new owner provided ice machine in kitchen d10...JOHN H. WOODSON K-8 SCHOOL New owner provided water filter to be added for new owner provided ice machine in kitchen d10...
Item #:19 Print Sequence:19.0 Status:2BPO - Bid to PO
Quantity:1.0 Uom:EA
Unit Cost
$4,500.00
Tax Rate
0.0%
Award
Awarded: 04/03/2023
JOHN H. WOODSON K-8 SCHOOL New owner provided pre water filter to be added for new owner provided water filter in kithce...JOHN H. WOODSON K-8 SCHOOL New owner provided pre water filter to be added for new owner provided water filter in kithce...
Item #:20 Print Sequence:20.0 Status:2BPO - Bid to PO
Quantity:1.0 Uom:EA
Unit Cost
$3,500.00
Tax Rate
0.0%
Award
Awarded: 04/03/2023
JOHN H. WOODSON K-8 SCHOOL Existing Milk Cooler to be removed and replaced with new owner provided milk cooler in caf. ...JOHN H. WOODSON K-8 SCHOOL Existing Milk Cooler to be removed and replaced with new owner provided milk cooler in caf. ...
Item #:21 Print Sequence:21.0 Status:2BPO - Bid to PO
Quantity:1.0 Uom:EA
Unit Cost
$2,000.00
Tax Rate
0.0%
Award
Awarded: 04/03/2023
JOHN H. WOODSON K-8 SCHOOL Existing range to be removed and replaced with new owner provided range under existing exhaus...JOHN H. WOODSON K-8 SCHOOL Existing range to be removed and replaced with new owner provided range under existing exhaus...
Item #:22 Print Sequence:22.0 Status:2BPO - Bid to PO
Quantity:1.0 Uom:EA
Unit Cost
$4,900.00
Tax Rate
0.0%
Award
Awarded: 04/03/2023
JOHN H. WOODSON K-8 SCHOOL New owner provided deck oven to be added under existing exhaust hood in kitchen d104. (item n...JOHN H. WOODSON K-8 SCHOOL New owner provided deck oven to be added under existing exhaust hood in kitchen d104. (item n...
Item #:23 Print Sequence:23.0 Status:2BPO - Bid to PO
Quantity:1.0 Uom:EA
Unit Cost
$4,900.00
Tax Rate
0.0%
Award
Awarded: 04/03/2023
JOHN H. WOODSON K-8 SCHOOL Existing dishwasher to be removed, new owner provided dishwasher to be located in existing di...JOHN H. WOODSON K-8 SCHOOL Existing dishwasher to be removed, new owner provided dishwasher to be located in existing di...
Item #:24 Print Sequence:24.0 Status:2BPO - Bid to PO
Quantity:1.0 Uom:EA
Unit Cost
$6,500.00
Tax Rate
0.0%
Award
Awarded: 04/03/2023
JOHN H. WOODSON K-8 SCHOOL New owner provided refrigerated merchandiser to be added to caf. Servery d103. (item no. 11 -...JOHN H. WOODSON K-8 SCHOOL New owner provided refrigerated merchandiser to be added to caf. Servery d103. (item no. 11 -...
Item #:25 Print Sequence:25.0 Status:2BPO - Bid to PO
Quantity:1.0 Uom:EA
Unit Cost
$3,000.00
Tax Rate
0.0%
Award
Awarded: 04/03/2023
Totals: $Vendor Gross Total:
$ Vendor Net Total:
$ Evaluation Total:
$ Awarded:
$1,682,640.00
$1,682,640.00
$1,682,640.00
$1,682,640.00
Eval Codes:
Pref Codes:
Evaluation Code Descriptions:
= Lowest Item Price or Lowest Evaluation Quote Total